شرکت  توسعه  تجهيزات  رُ زRose Equipment Development Company

  • Water Transmission Project from Chaah-Nimeh to Zahedan city

 

Client : Sapta Co.

Main Client : Water and wastewater of regional of Sistaan and Blochestaan province

Location : Sistan and Blochestan province

Date : 2002 ~ 2003

 

Designing, procurement, panel construction, installation, cabling, commissioning of electrical, instrumentations,  industrial automation control system (SCADA)  includes PLC and monitoring programming, local monitoring, telemetric of water transmission from Chaah-nimeh to Zahedan city  includes 4 pumps stations and two water reservoirs

 

Project specification :

ü       Head of water pump : 1510 meter

ü       Longitude path: 192 Km

ü       Pipe diameter longitude Transmission : 900 mm

ü       Pump Water capacitance : 850 liter/second

 

Specification of control system :

ü       PLC: Premium of Schneider electric Co. - 6 sets- in each station 1 devices

ü       HMI monitoring: Magelis  production of Schneider electric Co. - 1 pcs in each station for local monitoring- total 5 pcs

ü       Data Transmission with wireless Radio modem  to  SCADA monitoring system in Zahedan city

ü       SCADA central operation  monitoring system  includes one PC  with the CitectSCADA software (product of  Australian Citect co.)

ü       SCADA Protocol : Unitelway

ü       Supervision  of all stations from SCADA system in the central office in Zahedan city

ü       Quantity of the I/O numbers is as following table:

 

No. of I/O

Section

296

Pump Station # 1

296

Pump Station # 2

296

Pump Station # 3

296

Pump Station # 4

144

Regulation Station

152

Zahedan Station

1480

Total

 

Water Pump path drawing - from Chah-Nimeh to Zahedan city

 

Medium Voltage room

 

Operation piano control panel with the local color monitoring display in each station

 

Interview of control panel in each station

 

One of pages color monitoring local system - PS2

 

Telemetry System Architecture

 

Pump Station #2 in SCADA

 

Zahedan Station in SCADA

 

Water dumping stroke system